2022 Mitsubishi OutlanderWhat kind of vehicle is the 2022 Mitsubishi Outlander? What does it compare to? The 2022 Outlander is the first entirely new Mitsubishi SUV in more than a decade. A seven-seat crossover with an architecture shared by the Nissan Rogue, the 2022 Outlander rivals the Honda CR-V, Toyota RAV4, VW Tiguan, and Subaru Forester. Is the 2022 Mitsubishi…

Work to seal the remaining unsealed section of State Highway 43 will start Monday 15 November.

Funded through Kānoa – Regional Economic Development and Investment unit, the project will improve safety and boost the region’s economy, while retaining the picturesque journey and protecting the natural environment.

Due to the constrained environment through the gorge and the heavy machinery required to undertake the work, the road will need to be closed  for periods while work is undertaken.

The road will be closed to traffic for a 2km section north of Moki Road, through the gorge, from 8am -12pm and 1pm – 5pm Monday to Friday until March 2022.

North and southbound traffic will be let through the site at the following times under Stop/Go traffic management with temporary speed limits in place:

9am

10am

11am

12-1pm (road open)

2pm

3pm

4pm

Motorists are asked to plan their journey to arrive at the gorge at these times to avoid delays of up to one hour.

Crews will clear traffic at other times if there are vehicle queues and emergency services will be permitted access at all times.

Waka Kotahi takes seriously its responsibilities for the safety of staff, contractors and members of the public. All of our worksites have comprehensive COVID-19 protocols and work plans in place for the various alert levels, which are strictly adhered to.

Please drive carefully through the site, pay attention to directions from traffic management staff and signs, and treat our road works with kindness and respect as they work hard to undertake this important work.

Waka Kotahi thanks motorists for their patience.

Plan ahead for a safe, enjoyable journey. Keep up to date with:

These lane closures will allow for testing and site investigations in the middle of Girven Road ahead of the construction of the permanent road in this area in early 2022.

Girven Road is anticipated to be one lane in each direction from 5am Monday 15 November, with all lanes restored to traffic in both directions by 5am Thursday 18 November.

Works will be undertaken during days shifts; however, lane closures will remain in place day and night. Access to Bayfair Shopping Centre and Gloucester Road will be maintained throughout the investigations.

During the three-day lane closure:

  • Only one lane of Girven Road headed towards the Bayfair roundabout will be able to proceed straight at the Gloucester Road signalised intersection.
  • Only the right-hand lane will be able to turn right onto Girven Road from the Bayfair Shopping Centre carpark at the Gloucester Road signalised intersection.
  • The first vehicle entrance/exit to Bayfair Shopping Centre on Girven Road after the Bayfair roundabout will remain closed.
  • Existing vehicle access to all Girven Road properties will be maintained.
  • Pedestrians and cyclists are not expected to be impacted by these lane closures.

As part of these works, the material underneath the road will be tested to determine what loads it can bear to inform the extent of work required for future road construction.

From Monday 15 November, Tauranga City Council (TCC) will be undertaking a trial, introducing a cul-de-sac on Links Avenue. As part of TCC’s trial, vehicle access along Links Avenue will be restricted. Buses, emergency services and rubbish trucks will still have access, but bus timings could be impacted. The trial is expected to last up to five weeks.

For more information about the Links Avenue trial:

  • visit TCC’s website
  • email: email hidden; JavaScript is required 
  • phone: 07 577 7000.

As a result of the overlapping of these separate works, delays are expected in the wider area and road users are encouraged to plan ahead and allow extra time for their travel.

Motorists are asked to drive with extra care through the Bay Link site, reduce their speed and follow the directions provided by traffic management signs.

Waka Kotahi thanks motorists, local residents and businesses for their patience while this work is undertaken.

For any queries regarding this work, please contact 0508 222 4636.

For more information or to subscribe to project updates, visit the Bay Link website: nzta.govt.nz/baylink

Plan ahead for a safe, enjoyable journey. Keep up to date with:


District:

Bay of Plenty

Police are at the scene of a serious crash between car and a motorbike on Omokoroa Road, Omokoroa.

Emergency services were alerted at around 12:05pm.

One person is reported to be critically injured and a helicopter has been dispatched.

The Serious Crash Unit has been advised.

The road is closed and motorists are advised to avoid the area if possible as there are no diversions available.

ENDS

Issued by Police Media Centre

This 59km section of SH7 has been identified as a road where safer speed limits could help prevent people being killed or seriously injured from crashes.

“We want local people to share their thoughts on the current speed limits, including around places like local walking or mountain bike tracks, school bus routes, homes and workplaces,” says Waka Kotahi Director of Regional Relationships James Caygill.

Between 2011 and 2020 (ten years), there were 112 crashes on this stretch of road, says Mr Caygill. One person was killed, and 17 people were seriously injured.

“We’re working toward a future where no-one is killed or seriously injured in road crashes in Aotearoa New Zealand,” he says.

“Making sure speed limits are safe and appropriate for the road and its surroundings is one of the most effective things we can do to help prevent people dying or being seriously injured on our state highways.”

Download map

Speed limits need to be appropriate for the risks on the road. The stretch of road between Maruia Springs and Reefton is a single lane in each direction, and includes sweeping bends, narrow shoulders, and some straight sections of road.  Hazards include power poles, dense vegetation, waterways and trees on the narrow shoulders.

“No matter what causes a crash, speed is always a factor in the severity. Put simply, the speed of impact can be the difference between walking away or being carried away from a crash,” Mr Caygill says.

“Talking with the community helps us understand how people feel about current speeds in the area, including on roads near schools, homes or workplaces.”

This information helps Waka Kotahi decide if a speed limit change is the best thing to do to improve road safety, where new speed limits might begin or end, and if any other safety improvements might be needed.

“We’d like people to tell us how safe they feel and if there are any other sites or information that we need to be especially aware of,” he says.

Come and see us at a drop-in session:

67-69 Broadway, Reefton
Tuesday, 16 November, 2 – 4pm

Blacks Point Museum, Franklyn Street, Blacks Point
Tuesday, 16 November, 5 – 7pm

St John rooms next to the Fire Station, SH7, Springs Junction
Wednesday, 17 November, 11am – 1pm

Join us for an online drop-in session:

Please email email hidden; JavaScript is required to register for one of the two following sessions:

  • Monday, 15 November, 6 – 7pm
  • Wednesday, 17 November, 6 – 7pm

If you are unable to attend in person or our online session and wish to provide feedback, you can use our online feedback tool on our project webpage or email email hidden; JavaScript is required

Feedback opens today (10 November) and closes at 5pm on 24 November, 2021.

SH7 Maruia Springs to Reefton speed review

Speed review engagement information 

COVID-19

The drop-in events will only proceed under COVID-19 Alert Levels 1 and 2. If they are unable to proceed due to a change in alert levels you can still have your say by emailing your feedback or commenting on our interactive map on the project webpage, or attending our online drop-in session.

Plan ahead for a safe, enjoyable journey. Keep up to date with:

2022 Toyota CamryWhat kind of vehicle is the 2022 Toyota Camry? What does it compare to? Like Kleenex or Coke, the 2022 Toyota Camry is a household name by now. Forget dull Camry sedans of yore, though. The latest model is stylish and fun, even in hybrid form. There’s a Camry for just about every want or need, too—at least for shoppers willing to look…


District:

Central

The southbound lane is now open on State Highway 1, Kuku, following a fatal crash this afternoon.

Police expect the northbound lane to reopen within the next 30 minutes.

We would like to extend our thanks to motorists for their patience while we worked at the crash scene. 

Information regarding the number of fatalities will be issued as soon as we are able. 

ENDS

Issued by Police Media Centre. 

Emergency services are on their way to the site of the crash and Police will need to undertake an investigation, so the road will be closed for several hours.

Motorists are advised to avoid the area and delay their journey, if possible, as there is no viable detour route.

Updates will be posted on the Waka Kotahi Journey Planner webpage, Facebook and Twitter (links below).

Plan ahead for a safe, enjoyable journey. Keep up to date with:

Stop/Go traffic management and a temporary speed limit of 30km/h will be in place from 7am to 7pm from Monday. Minor delays can be expected.

Outside these hours the road will be open for traffic in both directions with temporary speed limits in place throughout.

Work is expected to take five weeks, weather permitting. 

As part of the work, the existing road material will be excavated and removed, with new material put in its place.

Contractors will also be replacing a section of SH5 near Rangitaiki after the Christmas/New Year period. Work is scheduled to start on 10 January 2022 and is expected to take six weeks, weather permitting. 

Waka Kotahi thanks road users for their patience while we carry out these important works.

Plan ahead for a safe, enjoyable journey. Keep up to date with:

Access for residents and emergency services will be maintained at all times, please follow the direction of staff on site.

The detour will be via SH1 Normandy Ave and State Highway 3 Ohaupo Road.

Waka Kotahi thanks motorists for their patience.

Plan ahead for a safe, enjoyable journey. Keep up to date with: