District:

Counties Manukau

Emergency services are in attendance at a serious crash on Highbrook Drive in East Tamaki.

The two-car crash happened around 6:20am about 1km west of El Kobar Drive.

Initial indication are that two people are seriously injured.

Diversions are in place as the road is blocked currently.

ENDS

Issued by the Police Media Centre


District:

Waitematā

One person has died after a multiple vehicle crash in Waitematā this afternoon.

Police were notified of the crash at the intersection of Sunrise Avenue and East Coast Road in Windsor Park, Mairangi Bay at around 3pm.

The driver of one of the vehicles died at the scene.

There were no significant injuries to any of the occupants in the other three vehicles.

The Serious Crash Unit attended the scene, and enquiries into the circumstances of the crash are ongoing.

ENDS

Issued by Police Media Centre

2022 Audi A4What kind of vehicle is the 2022 Audi A4? What does it compare to? The 2022 A4 is a compact sedan and wagon lineup with plenty of high-tech luxury features and stellar turbocharged performance. Its traditional rivals include the BMW 3-Series and Mercedes-Benz C-Class, though shoppers are equally likely to compare it to the Audi Q5 crossover SUV…

As the Waka Kotahi NZ Transport Agency summer roadworks programme gets under way this month, some of the region’s major work sites include State Highway 2 (Athenree to Bethlehem) and State Highway 36 (Pyes Pā to Ngongotahā), as well as continuing safety works on State Highway 33 between Paengaroa and Rotorua.

Bay of Plenty Transport System Manager Roger Brady says Waka Kotahi will be delivering roadworks on over 140 lane kilometres of state highway in the Bay of Plenty to ensure the safety and resilience of the network.

“The warmer and drier spring and summer months are the best time for major roadworks as daylight hours are longer and the warm temperatures and dry air helps new seal to stick to the road surface.

“Considerable planning is done with our team and suppliers to look at historic traffic and travel trend data, and what worked and didn’t work last season. While we aim to complete the work with as little disruption as possible, the reality is there will be delays to journeys,” says Mr Brady.

Waka Kotahi will use mobile message boards, social media and radio advertising to keep people informed ahead of major works. Motorists are encouraged to plan ahead by using the Journey Planner website.

Journey Planner

“We want to keep everyone safe, including our road workers. Speeding through roadworks puts the safety of other road users and our road workers at risk, and we ask that people please slow down, leave space and be patient.

“Most work stops before busy holiday travel periods like Labour weekend, Christmas and New Year to minimise disruption to people’s journeys. Where we can, we also try to complete roadworks at night, over the weekend or outside peak times,” says Mr Brady.

Waka Kotahi is responsible for approximately 11,000km of state highway network across New Zealand Aotearoa. At a value of $52 billion, the state highway network is the country’s largest value physical asset and is of critical importance to the country’s economic and social wellbeing, connecting people and places and efficiently moving freight to markets.

“The overall investment in maintenance through the 2021-24 National Land Transport Programme (NLTP) is $2.8 billion over the next three years, including an estimated $240 million for emergency works. This is a 30% increase on the previous three years.

“This means we can maintain current levels of service and we will prioritise keeping our roads safe, avoiding disruption for users, as well as minimising future costs of restoring the network to sustainable levels of service,” says Mr Brady.

Plan ahead for a safe, enjoyable journey. Keep up to date with:


8 October 2021: Waka Kotahi NZ Transport Agency advises resurfacing work will take place on State Highway 30 (SH30) at the Tahuna Road and Te Teko Road intersections in Te Teko next week.

Work will take place as follows:

  • Wednesday 13 October: 8am to 5pm
  • Thursday 14 October: 8am to 5pm

Stop/Go traffic management will be in place, with a 30km/h temporary speed limit.

During the work, there will be road closures at the Tahuna Road and Te Teko Road intersections, with signposted local road detours in place for motorists needing to access SH30.

Traffic needing to use Tahuna Road will be detoured via Galatea Road, and traffic needing to use Te Teko Road will be detoured to via Powell Road.

Motorists are asked to take extra care when travelling through the site and follow directions of traffic management staff and signs.

These works are part of the Waka Kotahi road maintenance programme to repair and reseal state highways across the Bay of Plenty to ensure the safety and resilience of the transport network.

In the event of bad weather or other unforeseen circumstances, work may be postponed.

Visit the interactive Waka Kotahi Journey Planner website for the latest information on roadworks, traffic, road closures and detours to help plan your trip.

Journey Planner website

Waka Kotahi thanks motorists for their patience.

Plan ahead for a safe, enjoyable journey. Keep up to date with:

A contract has been awarded to build a new, two-lane bridge over the Clutha River at Beaumont, part of SH8 in Otago, says Waka Kotahi NZ Transport Agency. 

“A $25 million construction contract has been awarded to HEB Construction,” says Colin MacKay, Principal Project Manager for Waka Kotahi.

“We are anticipating crews setting up on the new bridge site in the coming weeks with work starting on the bridge from the end of this year. The aim is to have this long awaited, two-lane bridge open in the second half of 2024.

Visualisation of the new and existing Beaumont bridges.

“The existing 137-year-old single lane, wrought iron bridge is one of a handful still operating on our highway network, and forms an important link on SH8 between Dunedin, Central Otago and Queenstown. However, it’s no longer suited to today’s higher traffic volumes, and the growing number of larger trucks using this highway,” says Mr MacKay.

Clutha District Mayor Bryan Cadogan is also pleased to see progress at the Beaumont bridge site. “This is another key commitment to the Clutha District from Waka Kotahi and ensures greater access through to Central Otago with a bridge that is designed to meet modern requirements.” 

The new bridge has been designed to meet expected traffic growth, including heavier trucks, and modern earthquake standards. After it opens, the landmark single lane bridge will continue to serve the area by providing a link to the popular nearby Clutha Gold walking and cycling trail.

“The new bridge will be a key contributor to creating a transport system for Otago and Clutha District that’s safe, resilient, meets current and future needs, and connects people, products and places,” says Mr MacKay.

  • The new bridge will be 195 metres long, formed by curved steel girders, supported by four piers sitting about 12 metres above the average river level.
  • Safety barriers will be fitted on the road approaches, with a two-metre wide walking and cycling pathway a feature of the bridge design.

New Beaumont Bridge information

Plan ahead for a safe, enjoyable journey. Keep up to date with:

Please note this Traffic Bulletin is updated every Friday.

Check daily updated closure information:

Unless otherwise stated, closures start at 8pm and finish at 5am.

NORTHERN MOTORWAY (SH1)

  • Silverdale southbound on-ramp, 14 October
  • Northbound lanes between Oteha Valley Road off-ramp and Silverdale on-ramp, 10–14 October
  • Oteha Valley Road northbound on-ramp, 10–14 October
  • Southbound lanes between Oteha Valley Road off-ramp and Greville Road on-ramp, 13–14 October
  • Southbound lanes between Oteha Valley Road off-ramp and Upper Harbour Highway on-ramp, 10–12 October
  • Oteha Valley Road southbound on-ramp, 10–14 October
  • Greville Road southbound on-ramp, 10–12 October
CENTRAL MOTORWAY JUNCTION (CMJ)
  • Symonds Street southbound on-ramp, 14 October
SOUTHERN MOTORWAY (SH1)
  • Southbound lanes between Gillies Avenue off-ramp and Greenlane on-ramp, 10 October
  • St Marks Road southbound on-ramp, 10 October
  • East Tamaki Road northbound on-ramp, 12 October
  • East Tamaki Road northbound off-ramp, 12 October
  • Northbound lanes between Drury/ SH22 off-ramp and Papakura on-ramp, 10–14 October
  • Drury/ SH22 northbound on-ramp, 10–14 October
  • SH1 southbound to SH2 eastbound link, 12 October
NORTHWESTERN MOTORWAY (SH16)
  • Southbound link to SH20 southbound (Waterview southbound tunnel closed), 11 October
  • Westbound link to SH20 southbound (Waterview southbound tunnel closed), 11 October
  • Southbound lanes between Brigham Creek Roundabout off-ramp and Lincoln Road on-ramp, 13 October
  • Hobsonville Road southbound on-ramp, 13 October
  • Royal Road southbound on-ramp, 13 October
  • Lincoln Road southbound off-ramp, 10–12 October
  • Te Atatu northbound on-ramp, 14 October
UPPER HARBOUR MOTORWAY (SH18)
  • Westbound lanes between Caribbean Drive and Albany Highway on-ramp, 14 October
  • Eastbound lanes between Albany Highway off-ramp and Paul Mathews Road, 11 & 14 October
  • Albany Highway eastbound on-ramp, 11 & 14 October
  • Westbound lanes between Brigham Creek Road off-ramp and Hobsonville Road on-ramp, 13 October
  • SH18 westbound to SH16 eastbound link, 13 October
  • Brigham Creek Road westbound on-ramp, 13 October
SOUTHWESTERN MOTORWAY (SH20)
  • Southbound lanes between Rimu Road off-ramp and Massey Road on-ramp, 14 October
  • Walmsley Road southbound on-ramp, 14 October
  • SH20 southbound to SH20A westbound link, 14 October
  • Southbound lanes between Massey Road off-ramp and Puhinui Road on-ramp, 11 October
  • Massey Road southbound on-ramp, 11 October
  • Puhinui Road southbound off-ramp, 10 October
GEORGE BOLT MEMORIAL DRIVE (SH20A)
  • None planned
PUHINUI ROAD (SH20B)
  • None planned
STATE HIGHWAY 22 (SH22)
  • None planned
STATE HIGHWAY 2 (SH2)
  • None planned

Please follow the signposted detours. Waka Kotahi thanks you for your co-operation during these essential improvements and maintenance.

To check for the most current overnight closure information before your leave, please visit:
journeys.nzta.govt.nz/traffic/auckland

Auckland roads and public transport:
at.govt.nz

Waka Kotahi NZ Transport Agency Bay of Plenty System Manager Roger Brady says the steep slope below the road has progressively deteriorated since December 2019, and further deterioration would put the state highway at risk; the alternative detour is approximately 6 and a half hours.

“The works will consist of constructing a 27-metre long sheet-pile retaining wall and upgrading the drainage in the area, and are expected to be complete in mid-December.”

The site has been operating with a reduced 30km/h temporary speed limit in place, and will be reinstated to the permanent speed limit on completion of the works.

Due to the complex nature of the repair and the confined working area, temporary traffic management will be required, including a 30km/h temporary speed limit. Stop/Go traffic management will be in place from 7am – 5pm and traffic lights in place overnight from 5pm – 7am, Monday to Friday. Some weekend work may be required.

Over width vehicles are able to pass through the worksite, however haulage companies with any significant loads over 3.5m in width are to liaise with Waka Kotahi prior to travel.

Mr Brady asks people to be patient and respectful to roadworkers and to look out for their safety and wellbeing.

“If you are using the roads during this period remember to comply with temporary speed reductions and directions of traffic management staff to help keep everyone safe.”

In the event of bad weather or other unforeseen circumstances, work may be postponed. Visit the interactive Waka Kotahi Journey Planner website for the latest information on roadworks, traffic, road closures and detours to help plan your trip.

Waka Kotahi thanks motorists for their patience.

Journey Planner website

Plan ahead for a safe, enjoyable journey. Keep up to date with:

Contractors will be following strict industry standards provided by Construction Health and Safety NZ (CHASNZ) to ensure the safety of workers and road users. People must maintain safe physical distancing of two metres when walking/cycling near the sites.

Some delays are expected at times, and motorists are advised to plan and allow extra time for their journeys. There may be an increase in pedestrians and cyclists around the site, so please be careful when driving near them.

Sunday 10 October:

  • State Highway 30, Vaughan Road to Marino Road eastbound road closure: Contractors will be installing a stormwater pipe in both eastbound lanes between Vaughan and Marino Road on Sunday 10 October, between 7am and 7pm. Vehicles travelling eastbound on SH30 (towards Tarawera intersection), are required to follow the short detour via Vaughan Road – Marino Road – SH30/Te Ngae Road. This work may cause minor delays.

Work sites for the week starting Sunday 10 October:

  • State Highway 30, Sala Street to Allen Mills Road (nightworks): Contractors will be applying the final layer of road surface between Sala Street and Allen Mills Road from Sunday 10 to Friday 15 October. These works will be carried out overnight, between 6pm and 6am, and are weather dependent. Lane shifts and some side road closures will be in place with one lane being maintained in both directions on SH30/Te Ngae Road. This work may cause moderate delays.
  • State Highway 30, Sala Street to Vaughan Road: The footpath on the northern side remains closed as contractors construct a fence and complete landscaping works in this area. Shoulder closures may be in place during off-peak times.
  • State Highway 30, Puarenga Bridge underpass: The Puarenga Bridge underpass is open with pedestrians and cyclists advised to take care as contractors continue with landscaping works through this area.
  • State Highway 30, Puarenga Bridge shared footpath: Contractors continue to connect the shared footpaths on either side of Puarenga Bridge. This work will require lane closures in both directions during off-peak hours and may cause moderate delays. One lane in both directions will be maintained at all times.
  • State Highway 30, centre median Hamiora Place: Travelling eastbound on SH30 (towards Tarawera intersection), the u-turn bay at the Hamiora Place intersection will be closed to allow our team to pour concrete in the median island. Travelling westbound on SH30, the right-turn bay into Hume Pine will also be closed. One turn bay will remain open while the other is being poured. This work will be completed during off-peak hours and may cause minor delays.
  • State Highway 30, Tarawera intersection: Contractors continue to construct the footpaths and concrete islands separating opposing traffic. Heading eastbound, one of the right-turn lanes into Tarawera Road may be closed during off-peak hours. This may cause moderate delays. Motorists are requested to adhere to the temporary speed limit of 30km/h.
  • Tarawera Road: Contractors will be installing a new watermain between the Redwoods Centre entrance and Awatea Terrace. A shoulder closure will be in place with a temporary reduced speed limit of 30km/h.
  • State Highway 30, Allen Mills Road to Anytime Fitness: Landscaping works in the centre median, and footpath works will continue in this area. This work will require eastbound lane closure which may cause moderate delays. The right turn into Allen Mills Road for westbound traffic from SH30/Te Ngae Road remains closed. Motorists, in particular heavy haulage, are required to detour via Ōwhata and Vaughan roads to access Allen Mills Road. Electronic signage is in place to advise of the access restrictions.
  • State Highway 30, Allen Mills Road to Iles Road: Guardrail and rain garden work continues between Allen Mills Road and Iles Road. This work requires both east and westbound lane closures during off-peak hours, which may cause moderate delays. One lane in both directions will be maintained at all times.
    Pedestrian access through this section is for business access and residents only as there is no through access to the Rotorua CBD. See map below for pedestrian access routes.
  • State Highway 30, Brent Road and Tumene Drive intersection: Contractors continue constructing the raised safety platforms on Brent Road and Tumene Drive to improve safety for all users. This work includes kerb and footpath work. Lane closures and detours may be in place with stop/go traffic management which may cause moderate delays.

Temporary speed limits of 30km/h or 50km/h are in place for everyone’s safety at the above work sites, including when workers are off-site.

Pedestrians and cyclists are encouraged to use the signalised crossings at either Sala Street or Iles Road, and the temporary pedestrian crossing at Tarawera Road.

In the event of bad weather or other unforeseen circumstances, work may be postponed.

Waka Kotahi thanks motorists for their patience and understanding while this important work is undertaken to improve SH30 for everyone using the road. 

Plan ahead for a safe, enjoyable journey. Keep up to date with: