A second amber alert has been forecasted from 3pm to 6pm on Friday 21 July, with gusts of 75 to 80 km/h also likely.
Under an amber alert, speeds may be reduced and some lanes on the bridge may close.
The bridge will remain in a 4×4 configuration overnight.
Motorists are urged to drive to the conditions, look out for the electronic message boards which will indicate lane closures and reduced speeds, and stay within their lane while travelling across the bridge.
Drivers of high sided vehicles and motorcyclists are advised to avoid the Auckland Harbour Bridge and use the western ring route on State Highways 16 and 18.
Watch the video below to understand why lanes on the bridge may need to close if certain wind speed thresholds are reached.
The safety of road users is our top priority and we won’t hesitate to reduce speeds or close lanes if necessary.
Waka Kotahi thanks road users for their patience and understanding.
What kind of vehicle is the 2024 Chevrolet Malibu? What does it compare to? The 2024 Chevrolet Malibu is the sole mid-size sedan remaining from a Detroit brand. Competitors include the Toyota Camry, Honda Accord, Kia K5, and Subaru Legacy. Is the 2024 Chevrolet Malibu a good car? It’s solidly average and competitively priced, but competitors…
Road users should consider alternative routes or delaying their journey as peak hour delays in these areas are expected.
State Highway 2 – Between Tōtara Park Road and Gibbons Street
There will be a southbound lane closure until contractors complete pavement repairs and the lane is safe to be reopened to traffic.
The repairs will continue alongside ongoing median barrier installation work.
Drivers can expect temporary speed limits and stop/go traffic management to remain in this area.
State Highway 58 – near Bradey Road
A 30km/h speed restriction will remain in place until pavement works are completed.
Further nightworks and are planned for the rest of this week between 8pm and 4am.
Waka Kotahi appreciates these works have occurred at short notice and created delays and frustration for drivers. However, for safety reasons, the surfacing works must be done as soon as possible. Contractors are working hard to complete them.